Âé¶¹´«Ã½ÍøÕ¾

Âé¶¹´«Ã½ÍøÕ¾ has mandated Corenov Constructeurs to carry out the following project: Macdonald Stewart Building (Macdonald Campus) / 17-088 Basu Lab and Kitchenette.

The project consists of the renovation of rooms MS3-047 and MS3-048 on the third floor of Macdonald Stewart Building.

Project manager:ÌýMark Ouimet –Ìýmark.ouimet [at] mcgill.ca

Assistant project manager: Claudia CarpanzanoÌý-ÌýClaudia.carpanzano [at] mcgill.caÌý

Classified as: Macdonald Campus, Macdonald Stewart Building
Published on: 19 Sep 2023

Âé¶¹´«Ã½ÍøÕ¾ has mandated Ardec Construction Inc. to carry out the following project: Montreal Neurological Institute / 18-121 - Cyclotron aerial exhaust.

The project consists of installing the aerial conduit to replace the existing one at the Montreal Neurological Institute hospital.

Project manager:ÌýEric Boutet, CIMA+ - eric.boutet [at] cima.caÌý">eric.boutet [at] cima.caÌý

Classified as: MNI, Montreal Neurological Institute
Published on: 19 Sep 2023

Âé¶¹´«Ã½ÍøÕ¾ has mandated Corenov Constructeurs to carry out the following project: Macdonald Stewart Building (Macdonald Campus) / 20-021 JELF Roy.

The project consists of the renovation of lab MS2-094A on the second floor of the Macdonald Stewart Building.

Project manager:ÌýMark Ouimet –Ìýmark.ouimet [at] mcgill.ca

Assistant project manager: Claudia CarpanzanoÌý-ÌýClaudia.carpanzano [at] mcgill.caÌý

Classified as: Macdonald Campus, Macdonald Stewart Building
Published on: 19 Sep 2023

Âé¶¹´«Ã½ÍøÕ¾ has mandated Immobilier Belmon to carry out the following project: Currie Gym / 16-140 - Renovation of classrooms W305 and W409.

The project consists of the upgrade of classrooms W-409 and W-305 at Currie Gym to improve the learning experience, including new seating arrangement, Audio-Visual equipment, and lighting.

Project manager:ÌýJoé Normandeau – joe.normandeau [at] gph-inc.com

Classified as: Currie Gym
Published on: 17 Aug 2023

Âé¶¹´«Ã½ÍøÕ¾ has mandated NR Brosseau to carry out the following project:ÌýMcIntyre Medical Building / 21-008 - JELF, Chen.

The project consists of minor renovations of laboratory rooms 712, 723 and 726.

Project manager: Andrea Gore -ÌýAndrea.gore [at] mcgill.ca

Assistant project manager: Ellie Tayebi -ÌýEllie.tayebi [at] mcgill.ca

Construction start date:ÌýJuly 7, 2023

Classified as: McIntyre, Mcintyre building
Published on: 6 Jul 2023

Âé¶¹´«Ã½ÍøÕ¾ has mandated Procova Inc. to carry out the following project: McIntyre Medical Building / 15-104 - Modification of the fourth floor electrical room distribution.

This project includes installing a second transformer to provide the required additional electrical capacity for the building and to update the emergency electrical distribution within the building.

Project manager:ÌýEmika Marinacci -ÌýEmika.marinacci [at] mcgill.ca

Classified as: Mcintyre building, McIntyre
Published on: 6 Jul 2023

Âé¶¹´«Ã½ÍøÕ¾ has mandated Corenov Constructeurs to carry out the following project:ÌýMorrice Hall / 22-038 - Priority building envelop repairs, lower roof.

The project consists of the installation of a steel structure in the library to stabilize the roof and exterior walls of the turret.

Project Manager andÌýAssistant Project Manager:

Classified as: Morrice Hall
Published on: 27 Jun 2023

Please be advised that Facilities Management and Ancillary services (FMAS) has mandated Belmon Construction to carry out the following project:18-101 Strathcona Music - Renovation of Percussion Studios for Rooms C101 to C109 (lot 1).

The project consists of a complete renovation of the nine percussion rooms, including new layouts, acoustical treatment, audiovisual equipment, new mechanical and electrical systems, and custom storage for the instruments.

Classified as: Strathcona Music, renovation
Published on: 20 Jun 2023

Please be advised that Âé¶¹´«Ã½ÍøÕ¾ has mandated Concept P.V.R. Inc.Ìýto carry out the following project : 18-156 McConnell Arena / Renovations (phase 1) – Electrical upgrade

Description :

Classified as: McConnell Arena, Construction, Athletics, renovation
Published on: 20 Jun 2023

Âé¶¹´«Ã½ÍøÕ¾ has mandated Corenov Constructeurs to carry out the following project: Peterson Hall / 14-113 - Mechanical room upgrade. The project includes preparing, patching, and painting walls, repairing and levelling floor slabs, and the restoration of surfaces around the mechanical room.

Project manager:ÌýWendy Rivera - wendy.rivera [at] mcgill.ca

Assistant project manager:ÌýJeremy Elbaz -Jeremy.elbaz [at] mcgill.ca

Classified as: Peterson Hall
Published on: 9 Jun 2023

Âé¶¹´«Ã½ÍøÕ¾ has mandated ARDEC to carry out the following project: Montreal Neurological Institute / 18-121 - Cyclotron.

The project consists of replacing the cyclotron's conduit.

Project manager:ÌýEric Boutet, CIMA+ -Ìýeric.boutet [at] cima.ca

Assistant project manager:ÌýAldo Aranza Mendoza, CIMA+ -Ìýaldo.aranzamendoza [at] cima.ca

Construction start:ÌýMay 19, 2023

Classified as: MNI
Published on: 17 May 2023

Âé¶¹´«Ã½ÍøÕ¾ has mandated Concreate Construction to carry out the following project: Bronfman Building / 18-089 - Infrastructure for new parking equipment.

The project consists of the reparation of the existing ramp to solve water infiltration issues and the installation of new upgraded parking infrastructure.

Project manager:ÌýAndré Labelle -Ìýandre.labelle [at] mcgill.ca

Classified as: Bronfman Building
Published on: 17 May 2023

Âé¶¹´«Ã½ÍøÕ¾ has mandated Vitrerie RD to carry out the following project: 680 Sherbrooke / 18-106 - Mock-up curtain wall.

The project consists of the removal, survey of existing conditions and replacement of three existing window panels inside classroom 491, as well as between floors (panels above and below).

Project manager:ÌýAndré Labelle - andre.labelle [at] mcgill.ca

Classified as: 680 Sherbrooke
Published on: 8 May 2023

Âé¶¹´«Ã½ÍøÕ¾ has mandated NR Brosseau Inc to carry out the following project: Strathcona Music / 18-101 - room E-109.

The project consists of acoustical work in room E-109 and includes the installation of a new door, door frame and new acoustic ceiling tiles.

Project manager:ÌýWendy Rivera - wendy.rivera [at] mcgill.ca

Assistant project manager:ÌýJeremy Elbaz - jeremy.elbaz [at] mcgill.ca

Classified as: Strathcona Music Building
Published on: 5 May 2023

Âé¶¹´«Ã½ÍøÕ¾ has mandated Couvertures St-Léonard to carry out the following project:ÌýUniversity Centre / 18-045 - roof replacement

The project consists in the replacement of the roof, skylights and storm drains.

Project managers:ÌýEric Boutet, CIMA+ -Ìýeric.boutet [at] cima.ca

Assistant project manager:ÌýAldo Aranza Mendoza, CIMA+ -Ìýaldo.aranzamendoza [at] cima.ca

Construction start date:ÌýMay 2023

Classified as: University Centre
Published on: 25 Apr 2023

Pages

Back to top