Âé¶¹´«Ã½ÍøÕ¾

Please be advised that Âé¶¹´«Ã½ÍøÕ¾ has mandated Atwill-Morin Maçonnerie to carry out the following project: 22-033 Lyman Duff New Wing (B169) – Priority building envelope repairs

¶Ù±ð²õ³¦°ù¾±±è³Ù¾±´Ç²Ô:ÌýRepair/replacement of damaged bricks & wall at the back of the building, adjacent to tunnel between MNI and Duff, up to the delivery dock of the Lyman Duff Building.

Construction start date: September 3rd, 2024

Planned construction end date: November 30th, 2024

Classified as: Lyman Duff
Published on: 5 Sep 2024

Please be advised that Âé¶¹´«Ã½ÍøÕ¾ has mandated Corenov Construction to carry out the following project: 21-002 Raymond (Macdonald Campus) – JELF Dastmalchi (Lot 1)

¶Ù±ð²õ³¦°ù¾±±è³Ù¾±´Ç²Ô:ÌýRenovation of room R1-038 and partial renovation of room R1-037.

Construction start date: August 12th, 2024

Planned construction end date: September, 2024

Work schedule: Monday to Friday, 6 a.m. to 3 p.m.

Project Manager: Mark Ouimet - mark.ouimet [at] mcgill.ca

Classified as: Raymond – JELF Dastmalchi
Published on: 13 Aug 2024

Please be advised that Âé¶¹´«Ã½ÍøÕ¾ has mandated Atwill-Morin Maçonnerie to carry out the following project: 21-099 Strathcona Anatomy and Dentistry - Prototype for masonry restoration

¶Ù±ð²õ³¦°ù¾±±è³Ù¾±´Ç²Ô:ÌýPhase 2 of the renovation associated to the study aimed at confirming the condition of the masonry walls and identifying a strategy to renovate the building envelope.

Construction start date: July 8th, 2024* with mobilization potentially starting July 4th , 2024.

Classified as: Strathcona Anatomy Dentistry
Published on: 9 Jul 2024

Please be advised that Âé¶¹´«Ã½ÍøÕ¾ has mandated Les Entreprises N.R. Brosseau inc. to carry out the following project: 20-201 Burnside Hall – 10th floor offices

¶Ù±ð²õ³¦°ù¾±±è³Ù¾±´Ç²Ô:ÌýRenovation of approximately 40% of the 10th floor for the Department of Mathematics and Statistics and the Computational & Data Systems Initiative. The project includes the demolition and reconstruction of interior spaces as well as work on the electrical, plumbing and ventilation systems.

Construction start date: July 8th, 2024

Classified as: Burnside Hall
Published on: 9 Jul 2024

Please be advised that Âé¶¹´«Ã½ÍøÕ¾ has mandated Mongrain Inc. (Lot 1) and Couverture Montréal-Nord (Lot 2) to carry out the following project: 22-019 Redpath Hall – Rehabilitation of Building Envelope - Lot 1, Repair and waterproofing of foundations, and Lot 2, Slate roof repair.

¶Ù±ð²õ³¦°ù¾±±è³Ù¾±´Ç²Ô:ÌýThe project consists of the first two lots (Lot 1, Foundation Repair, and Lot 2, Roof Repair) of the Redpath Hall building envelope rehabilitation project.

Construction start & end dates:

Published on: 27 Jun 2024

Please be advised that Âé¶¹´«Ã½ÍøÕ¾ has mandated Mongrain Inc. (Lot 1) and Couverture Montréal-Nord (Lot 2) to carry out the following project: 22-018 Redpath Library, McTavish Wing – Rehabilitation of Building Envelope - Lot 1, Repair and waterproofing of foundations, and Lot 2, Slate roof repair.

¶Ù±ð²õ³¦°ù¾±±è³Ù¾±´Ç²Ô:ÌýThe project consists of the first two lots (Lot 1, Foundation Repair, and Lot 2, Roof Repair) of the Redpath Library, McTavish Wing, building envelope rehabilitation project.

Construction start & end dates:

Classified as: Redpath Library
Published on: 27 Jun 2024

Please be advised that Âé¶¹´«Ã½ÍøÕ¾ has mandated Gicleurs Moderne Inc. to carry out the following project: 24-001 Macdonald Stewart - Upgrade Fire Suppression System LOT 1A (work in 3 laboratories).

¶Ù±ð²õ³¦°ù¾±±è³Ù¾±´Ç²Ô:ÌýInstallation of the main sprinkler line in the ceiling of three teaching laboratories located in the basement level of Macdonald-Stewart Building #446.

Construction start date: June 20, 2024

Planned construction end date: August 9, 2024

Classified as: Macdonald-Stewart
Published on: 20 Jun 2024

Please be advised that Âé¶¹´«Ã½ÍøÕ¾ has mandated La Cie Électrique Britton Ltée to carry out the following project: 17-160 McLennan Library – Convert 25kv distribution switches.

¶Ù±ð²õ³¦°ù¾±±è³Ù¾±´Ç²Ô:ÌýProject 17-160 aims to replace the 25 kV distribution switches located in the MB 32 room of the McLennan building on Âé¶¹´«Ã½ÍøÕ¾'s downtown campus. This equipment is critical for ensuring reliable electrical power supply to the McLennan Library, Bronfman, Armstrong, and Redpath Library buildings.

Construction start date: June 21, 2024

Classified as: McLennan Library
Published on: 20 Jun 2024

Please be advised that Âé¶¹´«Ã½ÍøÕ¾ has mandated Atwill-Morin Maçonnerie to carry out the following project: 22-036 (RVC Residence - B180) - Restoration of rendering on rear façades

¶Ù±ð²õ³¦°ù¾±±è³Ù¾±´Ç²Ô:ÌýThe project involves restoring the rendering on the rear façades of the Royal Victoria College (RVC), a student residence building, located on University Street.

Construction start date: July 2nd, 2024

Planned construction end date: End of October 2024

Classified as: Royal Victoria College (RVC) Residence
Published on: 17 Jun 2024

Please be advised that Âé¶¹´«Ã½ÍøÕ¾ has mandated Corenov Constructeurs Inc. to carry out the following project: 21-058 McCall MacBain Arts – Replacement of fire curtain between Arts and Leacock buildings.

¶Ù±ð²õ³¦°ù¾±±è³Ù¾±´Ç²Ô:ÌýReplacement of fire curtain between McCall MacBain Arts and Leacock buildings.

Construction start date: June 25th, 2024

Planned construction end date: October 2024

Work schedule: Monday to Friday, 6 a.m. to 3 p.m. Additional hours to be coordinated.

Classified as: McCall MacBain Arts Building
Published on: 17 Jun 2024

Please be advised that Âé¶¹´«Ã½ÍøÕ¾ has mandated DEVCOR to carry out the following project: 18-156 McConnell Arena upgrade – Lot 2

The project consists of upgrading the electrical infrastructure to enable the replacement of the ice-making system, which will allow the arena to remain open for a longer portion of the year. The project also includes the modernization of sections of the ventilation and cooling systems.

Construction start date: June 17th, 2024

Planned construction end date: August 2025

Classified as: Arena McConnell
Published on: 17 Jun 2024

Please be advised that Âé¶¹´«Ã½ÍøÕ¾ has mandated ²Ñ鳦²¹²Ô¾±³¦´¡³¦³Ù¾±´Ç²Ô to carry out the following project: 21-050 Replacement of steam and condensate pipes between Raymond and CINE, Macdonald Campus

Description:

Replacement of steam and condensate pipes between Raymond and CINE

Construction start date: June 12th, 2024

Planned construction end date: August 2024

Work schedule: Monday to Friday 6 a.m. to 3 p.m. Any additional hours will be coordinated.

Classified as: Raymond, CINE
Published on: 17 Jun 2024

Please be advised that Âé¶¹´«Ã½ÍøÕ¾ has mandated Rainville et Frères to carry out the following project: 19-163 McCall MacBain Arts – Masonry work.

Final phase of the masonry restoration on two facades of the west side of the McCall MacBain Arts Building.

Construction start date: June 17th, 2024

Planned construction end date: September 17th, 2024

Work schedule: Monday to Friday, 6 a.m. to 3 p.m.

Classified as: Arts Building, McCall MacBain Arts Building
Published on: 7 Jun 2024

Please be advised that Âé¶¹´«Ã½ÍøÕ¾ has mandated Constructions Seni Inc. to carry out the following project: 19-078 Otto Maass Chemistry – CFI IF 2020, Cooke.

The project consists of the transformation of the existing wet laboratory OM 025 into a dry laboratory to accommodate new class-4 lasers.

Construction start date: June 10, 2024

Planned construction end date: January 2025

Work schedule: Monday to Friday, 6 a.m. to 3 p.m. Additional hours to be coordinated with affected stakeholders.

Classified as: Otto Maass Chemistry
Published on: 31 May 2024

Please be advised that Âé¶¹´«Ã½ÍøÕ¾ has mandated Ceveco Inc. to carry out the following project: 19-016 Reconstruction of Upper Main Road, Downtown Campus

This project consists of the reconstruction of the Upper Main Road, from the Y intersection to the McCall MacBain Arts Building, including underground work.

Construction start date: June 17, 2024

Planned construction end date: October 2025

Work schedule: Monday to Friday, 6 a.m. to 7 p.m., Saturday, 6 a.m. to 7 p.m.

Classified as: main road
Published on: 29 May 2024

Pages

Back to top