Âé¶¹´«Ã½ÍøÕ¾ News - Construction updates /channels/news_feeds/all/term/construction_updates/rss en Construction starts: Macdonald-Stewart Building – Fire Suppression System Upgrade, Lot 2 /channels/channels/news/construction-starts-macdonald-stewart-building-fire-suppression-system-upgrade-lot-2-372810 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even"><p>Âé¶¹´«Ã½ÍøÕ¾ has mandated ARDEC CONSTRUCTION to carry out <strong>Project 24-001 Lot 2</strong> at the Macdonald-Stewart Building. The project involves upgrading the building’s existing fire suppression system, including the creation of a new two-hour fire-rated sprinkler room with a new building water entrance.</p></div></div></div><div class="field field-name-field-primary-image field-type-image field-label-hidden"><div class="field-items"><div class="field-item even"><img class="no-float" src="/channels/files/channels/styles/wysiwyg_medium/public/channels/image/macdonald-0136.jpg?itok=G1dfZjoR" width="160" height="111" alt="" /></div></div></div><div class="field field-name-field-published-date field-type-datestamp field-label-hidden"><div class="field-items"><div class="field-item even"><div class="custom-multi-date"><div class="multi-date first"><span class="label">Published: </span><span class="day">30 </span><span class="month">April </span><span class="year">2026</span></div></div></div></div></div> Thu, 30 Apr 2026 19:19:52 +0000 webfull 217957 at /channels Construction starts: Raymond Building – Roof Repair, Lot 1 South/West /channels/channels/news/construction-starts-raymond-building-roof-repair-lot-1-southwest-372799 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even"><p>Âé¶¹´«Ã½ÍøÕ¾ has mandated CÉLEB CONSTRUCTION to carry out <strong>Project 24-038</strong> at the Raymond Building. The project involves the replacement of the terracotta roof and the structural stabilization of the roof on the south-west section of the building.</p></div></div></div><div class="field field-name-field-primary-image field-type-image field-label-hidden"><div class="field-items"><div class="field-item even"><img class="no-float" src="/channels/files/channels/styles/wysiwyg_medium/public/channels/image/macdonald-0078.jpg?itok=Up-PFlXg" width="160" height="107" alt="" /></div></div></div><div class="field field-name-field-published-date field-type-datestamp field-label-hidden"><div class="field-items"><div class="field-item even"><div class="custom-multi-date"><div class="multi-date first"><span class="label">Published: </span><span class="day">30 </span><span class="month">April </span><span class="year">2026</span></div></div></div></div></div> Thu, 30 Apr 2026 19:02:04 +0000 webfull 217955 at /channels Construction starts: Bronfman Building – Modification of classroom locks /channels/channels/news/construction-starts-bronfman-building-modification-classroom-locks-372794 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even"><p>Âé¶¹´«Ã½ÍøÕ¾ has mandated Les Entreprises NR Brosseau to carry out <strong>Project 18-010 Lot 3</strong> at the Bronfman Building on the Downtown Campus. The project involves modifying classroom locks to enhance classroom safety and allow doors to be locked from inside the classroom, either electronically or mechanically, in the event of an emergency.</p></div></div></div><div class="field field-name-field-primary-image field-type-image field-label-hidden"><div class="field-items"><div class="field-item even"><img class="no-float" src="/channels/files/channels/styles/wysiwyg_medium/public/channels/image/bronfman-facade-daytime-mcgill_aug24_2021_000_laurie_devine.jpg?itok=BCtJtHcP" width="160" height="107" alt="" /></div></div></div><div class="field field-name-field-published-date field-type-datestamp field-label-hidden"><div class="field-items"><div class="field-item even"><div class="custom-multi-date"><div class="multi-date first"><span class="label">Published: </span><span class="day">30 </span><span class="month">April </span><span class="year">2026</span></div></div></div></div></div> Thu, 30 Apr 2026 17:51:58 +0000 webfull 217942 at /channels Construction starts: McIntyre Building – Tissue Culture Labs Renovation /channels/channels/news/construction-starts-mcintyre-building-tissue-culture-labs-renovation-372389 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even"><p>Âé¶¹´«Ã½ÍøÕ¾ has mandated Construction Bralteck Inc. to carry out <strong>Project 17-175</strong> at the McIntyre Medical Building. The project involves the renovation of tissue culture laboratories located in rooms 1138 to 1143.</p> <p>The work focuses on upgrading ventilation systems to address existing deficiencies and ensure compliance with current standards, as well as implementing minor laboratory modifications identified by Environmental Health and Safety (EHS).</p></div></div></div><div class="field field-name-field-primary-image field-type-image field-label-hidden"><div class="field-items"><div class="field-item even"><img class="no-float" src="/channels/files/channels/styles/wysiwyg_medium/public/channels/image/20080811_3525_final.jpg?itok=W6ZgUHYt" width="160" height="107" alt="" /></div></div></div><div class="field field-name-field-published-date field-type-datestamp field-label-hidden"><div class="field-items"><div class="field-item even"><div class="custom-multi-date"><div class="multi-date first"><span class="label">Published: </span><span class="day">9 </span><span class="month">April </span><span class="year">2026</span></div></div></div></div></div> Thu, 09 Apr 2026 18:01:24 +0000 webfull 217414 at /channels Construction starts: 2001 Âé¶¹´«Ã½ÍøÕ¾ College – SCSD Accessibility Improvements /channels/channels/news/construction-starts-2001-mcgill-college-scsd-accessibility-improvements-371967 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even"><p>Âé¶¹´«Ã½ÍøÕ¾ has mandated Corenov Inc. to carry out <strong>Project 22-031</strong> at 2001 Âé¶¹´«Ã½ÍøÕ¾ College. The project aims to improve accessibility and functionality for the School of Communication Sciences and Disorders (SCSD).</p> <p>The work will enhance inclusive access throughout the 8th floor by adding an accessible washroom, upgrading access control systems, improving storage facilities, and ensuring barrier‑free entry.</p></div></div></div><div class="field field-name-field-primary-image field-type-image field-label-hidden"><div class="field-items"><div class="field-item even"><img class="no-float" src="/channels/files/channels/styles/wysiwyg_medium/public/channels/image/2001_mcgill_college.jpg?itok=lSN1mIKF" width="160" height="107" alt="" /></div></div></div><div class="field field-name-field-published-date field-type-datestamp field-label-hidden"><div class="field-items"><div class="field-item even"><div class="custom-multi-date"><div class="multi-date first"><span class="label">Published: </span><span class="day">17 </span><span class="month">March </span><span class="year">2026</span></div></div></div></div></div> Tue, 17 Mar 2026 13:40:35 +0000 webfull 216877 at /channels Construction starts: Montreal Neurological Institute – Cognitive Neuroscience Unit reorganization /channels/channels/news/construction-starts-montreal-neurological-institute-cognitive-neuroscience-unit-reorganization-370748 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even"><p>Âé¶¹´«Ã½ÍøÕ¾ has mandated Gaston Champoux (1973) inc. to carry out <strong>Project 20-065</strong>, which supports the reorganization of the Cognitive Neuroscience Unit (CNU) at the Montreal Neurological Institute (MNI), located on the 2nd floor of the Penfield Wing. The project will transform Suite 285, currently used as a library, into offices, testing rooms, and dry laboratories dedicated to research in cognitive psychology and neuroscience.</p></div></div></div><div class="field field-name-field-primary-image field-type-image field-label-hidden"><div class="field-items"><div class="field-item even"><img class="no-float" src="/channels/files/channels/styles/wysiwyg_medium/public/channels/image/6134adb7-836a-42e5-9498-f5c640360f71.png?itok=AF_fc-U1" width="160" height="102" alt="" /></div></div></div><div class="field field-name-field-published-date field-type-datestamp field-label-hidden"><div class="field-items"><div class="field-item even"><div class="custom-multi-date"><div class="multi-date first"><span class="label">Published: </span><span class="day">3 </span><span class="month">February </span><span class="year">2026</span></div></div></div></div></div> Tue, 03 Feb 2026 16:08:38 +0000 webfull 215357 at /channels Construction starts: M.H. Wong Building – Lab 3053 renovation (FLJE/JELF – Ouzilleau) /channels/channels/news/construction-starts-mh-wong-building-lab-3053-renovation-fljejelf-ouzilleau-370744 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even"><p>Âé¶¹´«Ã½ÍøÕ¾ has mandated Les Entreprises N.R. Brosseau inc. to carry out <strong>Project 20-081</strong>, which involves the renovation of laboratory room 3053 in the M.H. Wong Building (FLJE/JELF – Ouzilleau). The project aims to adapt the existing laboratory space to support advanced research activities related to high-temperature pyrometallurgical processing of materials.</p></div></div></div><div class="field field-name-field-primary-image field-type-image field-label-hidden"><div class="field-items"><div class="field-item even"><img class="no-float" src="/channels/files/channels/styles/wysiwyg_medium/public/channels/image/m._h._wong_engineering_building.jpg?itok=BH3ELUnP" width="160" height="107" alt="" /></div></div></div><div class="field field-name-field-published-date field-type-datestamp field-label-hidden"><div class="field-items"><div class="field-item even"><div class="custom-multi-date"><div class="multi-date first"><span class="label">Published: </span><span class="day">3 </span><span class="month">February </span><span class="year">2026</span></div></div></div></div></div> Tue, 03 Feb 2026 15:46:14 +0000 webfull 215355 at /channels Construction Starts: McIntyre Medical Building – Renovation of the 6th floor /channels/channels/news/construction-starts-mcintyre-medical-building-renovation-6th-floor-369908 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even"><p>Âé¶¹´«Ã½ÍøÕ¾ has mandated Les Constructions Serbec Inc. to carry out<strong> Project 25-001</strong>, which involves the renovation of the 6th floor of the McIntyre Building as part of the Medicine cohort increase initiative. This work will reconfigure the existing floor to accommodate seven new hybrid classrooms dedicated to Clinical Skills Training, integrating in-person instruction with educational technology.</p></div></div></div><div class="field field-name-field-primary-image field-type-image field-label-hidden"><div class="field-items"><div class="field-item even"><img class="no-float" src="/channels/files/channels/styles/wysiwyg_medium/public/channels/image/20080811_3525_final.jpg?itok=W6ZgUHYt" width="160" height="107" alt="" /></div></div></div><div class="field field-name-field-published-date field-type-datestamp field-label-hidden"><div class="field-items"><div class="field-item even"><div class="custom-multi-date"><div class="multi-date first"><span class="label">Published: </span><span class="day">8 </span><span class="month">January </span><span class="year">2026</span></div></div></div></div></div> Thu, 08 Jan 2026 15:44:07 +0000 webfull 214685 at /channels Construction starts: McConnell Engineering Building – CFI IF 2023 Liboiron laboratory upgrades /channels/channels/news/construction-starts-mcconnell-engineering-building-cfi-if-2023-liboiron-laboratory-upgrades-370066 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even"><p>Âé¶¹´«Ã½ÍøÕ¾ has mandated Entreprises NR Brosseau Inc. to carry out <strong>Project 21-078</strong>, which involves upgrades within the McConnell Engineering Building as part of the CFI IF 2023 – Liboiron initiative. The project focuses on the installation of new specialized research equipment in two existing dry laboratories: Room MC010 and Room 816.</p></div></div></div><div class="field field-name-field-primary-image field-type-image field-label-hidden"><div class="field-items"><div class="field-item even"><img class="no-float" src="/channels/files/channels/styles/wysiwyg_medium/public/channels/image/mcconnell-building.jpg?itok=tUDUZ2b8" width="160" height="107" alt="" /></div></div></div><div class="field field-name-field-published-date field-type-datestamp field-label-hidden"><div class="field-items"><div class="field-item even"><div class="custom-multi-date"><div class="multi-date first"><span class="label">Published: </span><span class="day">5 </span><span class="month">January </span><span class="year">2026</span></div></div></div></div></div> Mon, 05 Jan 2026 18:13:17 +0000 webfull 214532 at /channels Construction starts: 680 Sherbrooke – Upgrades to parking access and EV infrastructure /channels/channels/news/construction-starts-680-sherbrooke-upgrades-parking-access-and-ev-infrastructure-368903 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even"><p>Âé¶¹´«Ã½ÍøÕ¾ has mandated St-Denis Thompson to carry out <strong>Project 18-013</strong>, which involves the renovation of the parking island and surrounding area at 680 Sherbrooke West. This work will include the installation of new parking access and exit equipment, as well as the introduction of four electric vehicle (EV) chargers, which will bring EV charging infrastructure to this garage for the first time.</p></div></div></div><div class="field field-name-field-primary-image field-type-image field-label-hidden"><div class="field-items"><div class="field-item even"><img class="no-float" src="/channels/files/channels/styles/wysiwyg_medium/public/channels/image/680sherbrooke.jpg?itok=7iKilaYG" width="160" height="120" alt="" /></div></div></div><div class="field field-name-field-published-date field-type-datestamp field-label-hidden"><div class="field-items"><div class="field-item even"><div class="custom-multi-date"><div class="multi-date first"><span class="label">Published: </span><span class="day">13 </span><span class="month">November </span><span class="year">2025</span></div></div></div></div></div> Thu, 13 Nov 2025 19:35:51 +0000 webfull 213235 at /channels